Working with the extra help from Lage (7) and Dresden (6)
was a huge blessing and encouragement this weekend.
The ventilation holes were secured with beams and 'finished off'...
(one in the kitchen, one in the nursery);
What a difficult, hard job - possible with extra help and personnel.
The drop-down ceiling is what Gary and the guys are working on tonight still.
The back entry, hallways and bathrooms were done this weekend.
What a change to hide all the wires and concrete behind clean white tiles!!!
AND
Did I say the hallway lights are on automatic sensors - that is really nice.
The door frames and doors are all in now;
and we're learning to work around them.
It's great to be able to close off sections
from the construction dust and dirt!
It's unfortunate the walls weren't already painted and electrical work done.
Vinyl tiles for the multi-purpose room and Sunday School rooms are done.
Some of the rooms were too cold, and needed to wait -
but Gary and Andre completed them last week.
The floors that still need to be done are:
- offices and boardroom which get rug
- the main sanctuary, after the walls are painted.
Ceramic tiles on floors and bathroom walls are now completed!
The 'base-tiles' (baseboard) now also have silicone sealant as well.
What a change to vacuum and mop level surfaces!
The basement hallway and bathroom are tiled...
offices and boardroom walls and floors need to be done there.
Plumbing and heating
(one step forward, two steps back)
BUT... we all love the functioning new bathrooms,
waiting for hot and cold water in all basins;
waiting for all toilets to be connected and functioning;
and YEAH for the three new showers stalls
waiting for water connection on two of them
So much work for only one employee.
Love the warmth we feel from the gurgling heaters (15 of the 52)
floor heat in the sanctuary and multi-purpose room is great!
A lot of work still left before all work as they should.
The 'conference room' was cleaned out on the weekend,
the heavy concrete slabs wheeled out
and 'garbage' removed;
Need to finish off the 'windows'
prepare the walls for wallpaper and paint,
complete electrical work,
install ceiling tiles
and level the floor, so the rug can be put in.
The 'Hausmeister' apartment now has a newly tiled bathroom,
it was cleaned on the weekend
and we can close the door!
Waiting for bathroom fixtures to be installed,
the new kitchen to arrive,
and the last part of the walls to be completed :)
No comments:
Post a Comment